|
Russian version coming soon!
PROJECT
INLAND GRAIN TERMINAL - KEMNAY (BRANDON), MANITOBA CANADA
CONSTRUCTION SCHEDULE
JULY 1999 - JUNE 2000
OWNER
PIONEER GRAIN (JAMES RICHARDSON INTERNATIONAL)
VALUE
CDN$5,750,000 TURNKEY DESIGN-BUILD PROJECT
DESCRIPTION
- 475,650 BU (13,000 TONNE) SLIPFORM CONCRETE
STORAGE STRUCTURE WITH 35 DIVISIONS
- DUAL RECEIVING DRIVESHEDS WITH PLATFORM
SCALE
- 2,000 SQ. FT. OF DEVELOPED OFFICE SPACE
- TRIPLE 15,000 BPH BUCKET ELEVATORS
- 30,000 BPH SHIPPING SYSTEM OVER TWO TRACKS
- 2,500 BPH CEREAL CLEANING SYSTEM

| |
|